The Full Roof Replacement Process
Roof replacement is not just laying shingles; it involves decking, waterproofing, drainage, ventilation, flashing and insurance. Inspect first, measure second, compare prices last.
1. Inspection and measurement
Inspect decking, shingles, flashing, gutters and penetrations, not just the surface.
Measure area and pitch; steeper roofs cost more in labor and waste.
Count existing layers to decide whether tear-off is required.
2. Material and quote
The same material has different grades, thickness and warranties.
Require itemized pricing: material, labor, tear-off, waterproofing, drainage, ventilation and permits.
Confirm color, lead time, weather schedule and change orders.
3. Installation and acceptance
Check underlayment, flashing, gutters and ventilation.
Require nail/debris cleanup and a water or visual inspection.
Keep contract, invoice, warranty and insurance paperwork.
FAQ
How long do asphalt shingles last?
Often 15–30 years depending on grade, climate, ventilation and installation; heat, moisture and poor ventilation shorten life.
Will insurance cover everything?
Usually only covered peril damage, minus deductible, and possibly actual cash value; normal wear is excluded.
Sources
More guides
Roof Insurance Claim ChecklistRead guide继续读
按顺序读,或跳到同主题的其他指南。